Our Progress in Pictures                              Scroll Down and Click The Thumbnail To View Full Size Picture!
 

 

Lab Nov 2008 Lab Nov 2008 Lab Nov 2008 Night Jan 09 Night Jan 09 Night Jan 09 Night Jan 09
Storm Aug 2008 Storm Aug 2008 Water Gun Test Sep 2008 Water Gun Test Sep 2008 Water Gun Test Sep 2008 Control Room Nov 2008 Lab Nov 2008
Laboratory June 2008 Molecular Sieves June 2008 Motor Control Center June 2008 Reverse Osmosis Machine June 2008 Tank Farm June 2008 Water Chiller June 2008 Yeast Propagation June 2008
CO2 Scrubber June 2008 Cooling Tower June 2008 DDE June 2008 Distillers Pad June 2008 Fermentation June 2008 Heat Transfer June 2008 Inside Of DDE June 2008
Arial Mar 2008 O'Neill Fire Pump Heater Mar 2008 O'Neill Office Mar 2008 Pouring Floor Switch Gear Room Mar 2008 Switch Gear Room Walls Mar 2008 Boiler June 2008 Centrifuge June 2008
More Bridge Towers Mar 2008 Bridge Towers Mar 2008 Centrifuge Deck Mar 2008 DDE Columns & Building Mar 2008 Distiller Columns & Bridges Mar 2008 Framing Walls Offices Mar 2008 Insulting Last Evaporator Column Mar 2008
DDE Roof Feb 2008 Finishing Ethanol Storage Feb 2008 Installing Ethanol Tanks Floating Roofs Feb 2008 Insulating Evaporator Columns Feb 2008 Load-out SiteO ffice - Fire Building Feb 2008 MPB Office Area Feb 2008 Setting Last Column Feb 2008
Wet Distillers Storage Pad Jan 2008 Dryer-RTO Area Jan 2008 Electrical Switch Gear Jan 2008 Ethanol Storage Jan 2008 Erecting Building O'Neill Jan 2008 Centrifuge Area Feb 2008 Corn Probe& Scales Feb 2008
MPB Chemical Area Jan 2008 MPB Chiller Jan 2008 Distillation Columns Jan 2008 CO2 Scrubber Jan 2008 Installing FenceO'Neill Jan 2008 BOILER Building Jan 2008 Gas Letdown Station Jan 2008
Main Process Build Chemical Area Dec 07 Main Process Build Pipe Rack Dec 07 P2S & NEDAK Accepting Dec 07 Paving O'Neill Site Dec 07 Train Loadout Dec 07 MPB Slurry Mix Tank Jan 2008 MPB Heat Exchangers Jan 2008
Site paving Nov 2007 Tapping rail O'Neill Nov 2007 Boiler Building Dec 07 Columns DDE Area Dec 07 DDE Area Evaporator Tower Dec 07 Ethanol Storage Dec 07 Installing Liner O'Niell Dec 07
Installing Pipe Rack Nov 2007 Main Process Building Piping Nov 2007 Main Process Building Roof Nov 2007 O'Neill Site Fire Water Tank Nov 2007 Paving Hillcrest Road Nov 2007 Road Paving Nov 2007 Setting Boiler equipment Nov 2007
Rail Road Oct 2007 Beer Column Being Delivered Nov07 Erecting Dryer & RTO Nov 2007 Fermtation Building Piping Nov 2007 Fire Water Tank & Pump House Nov 2007 Foundation Fire Water Tank & Pump House Nov 2007 Foundation Wet Distillers Storage Nov 2007
Erecting DDE Steel Oct 2007 Erecting the RTO Oct 2007 Fire Tank Foundation 1 Oct 2007 Fire Tank Foundation 2 Oct 2007 Lay Down Yard Oct 2007 O'Neill Ethanol Tank Oct 2007 Pouring Fire Tank Foundation Oct 2007
Working Roads To Plant Sep 2007 Boiler Foundation Oct 2007 Centrifuge Oct 2007 Cooling Tower Oct 2007 DDE Structure Oct 2007 DDE Switch Gear Building Oct 2007 Dryer & RTO Foundation Oct 2007
Roads And Parking Sep 2007 Centrifuge Foundations Sep 2007 DDE Structural Steel Sep 2007 Dryer Foundation Sep 2007 Pouring Main Process Floor Sep 2007 Setting Chiller Main Process Building Sep 2007 Rebar And Anchor Bolts Dryer Sep 2007
Installing Scales Aug 2007 Main Process Building Aug 2007 Plant & Corn Aug 2007 Pouring Road To Plant Aug 2007 Process Tank Farm Aug 2007 Setting Acid Reduction Column Aug 2007 Setting Equip DDE Aug 2007
Tank Foundation at the O'Neill Site July 2007 Installing Rail Road Aug 2007 Dryer Foundation Aug 2007 Ethanol Storage Compete Aug 2007 Ethanol Storage O'Neill Aug 2007 Ethonal Foundation Aug 2007 Installing Rail Road Aug 2007
Installing the Roof on the Fermentation Tanks July 2007 Main Process Building and Chemical Area July 2007 Main Process Building and Tank Farm July 2007 Mill Tower & Reclaim Tower July 2007 Pouring the Floor of the DDE Building July 2007 Receiving Buckets July 2007 Sub-Base on the O'Neill Railroad July 2007
Receiving Tower June 2007 Liquefaction Tank June 2007 RTO & Dryer June 2007 Arial 4 July 2007 DDE Vessel Foundations July 2007 Grain Conveyor North Section July 2007 Grain Conveyor South Section July 2007
Laydown yard May 2007 SubStation Transformer June 2007 O'Neill Transloading Site June 2007 Vessel Foundations June 2007 Milling Tower June 2007 Beerwell Roof June 2007 Beerwell & Fermentation Tanks June2007
Fermentation tank roof May 2007 Grain handleing equipment May 2007 O'Neill railrod site May 2007 Hammermil platform May 2007 Switch Yard May 2007 Liquefaction tank May 2007 Fermentation tanks May 2007
Jacking UP Grain Bins April 2007 Ferm. Building/Main Process Footers/SS Tanks April 2007 Office in Maintenance Building April 2007 Truck Unloading/Both Grain Bins/Milling Tower April 2007 Underground Piping April 2007 Milling Tower May 2007 Grain Storage Bins May 2007
Beer Well Foundation March 2007 Admin. Board Room April 2007 DDGS Building and Administration Building April 2007 Ferm. Building/Main Process Footers/SS Tanks April 2007 Fermentation Tanks 01 April 2007 Fermentation Tanks 02 April 2007 Fermentation Tanks 03 April 2007
No1 Fermentation Foundation Jan 2007 Aerial View March 2007 No3 Fermentation Foundation March 2007 Fermentation Foundation March 2007 South Grain Bins March 2007 DDGS March 2007 Truck Unloading Pit March 2007
North Grain Bin Bld Jan 2007 Pin for Bucket Elevator Jan 2007 No3 Fermentation Foundation Jan 2007 Truck Unloading Pit Jan 2007 Truck Unloading Pit Jan 2007 Admin Bld Jan 2007 Beer Well Foundation Jan 2007
Admin Bld 1 Oct 2006 Maint Bld 5 Oct 2006 Ferment Bld 12 Oct 06 Admin Bld Nov 06 DDGS Nov 06 Ferment Bld Nov 06 Well #2 Nov 06
Aerial View May 2005 Dirt Work June 2006 Dirt Work June 2006 Dirt Work June 2006 Groundbreaking July2006 Aerial View July 2006 EPC Signing Aug 2006
 © 2005 NEDAK ETHANOL LLC